Docks

 

diving dock on a steel frame, covered with western red cedar
steelwork is preformed through the winter month when the site can be accessed from the ice
160' of dock, supported by steel posts, pressure treated rafters and western red cedar decking
preparation of shoreline with large round stone, before new dock is built
frame work in pressure treated lumber, built when the water table is low in the winter
new cribs filled with 4" gabion stone, as new support of existing boathouse
new cribs and new pressure treated deck
using the existing stumps to carry the load for the platform at the end of the dock
western red cedar decking finished
western red cedar decking and lift up dock

the height of the new dock is measured by transit level from the existing dock